Client: Bord na Móna RESOURCE Recovery Ltd.


The Company acted as the Main Contractor and PSCS .

All works are carried out within the boundaries of a fully operational waste transfer facility at Blakecross, Lusk, operated by AES.

 Works included:

  • Remediation of contaminated ground and removal and disposal of underground diesel pipe.

  • Repair and remediate the existing surface water drainage system.

  • Construction of fire water retention wall.

  • Repair and remediation works to the existing yard area.