Client: Tempura Ltd.

Value: €1,088,000


Liffey Developments were acting as a main contractor and PSCS on this project.

The project comprised of the following:

  • Construct 370m of 9m wide access road and 36m ISD roundabout.
  • Construct 50m of 6m wide access road to the Node site off the main access roadway.
  • Extension of the existing trunk waste water and storm water sewers from the N2-N3 link road along the proposed roadway.
  • Extension of the water main from the N2-N3 link road along the proposed roadway.
  • Minor kerb realignments, construction of entry treatments and provision of road markings and signage along the proposed access roadway and roundabout.
  • Construction of a new surface water attenuation basin and associated inlet/outlet arrangements to the east to the proposed access road.
  • Realignment, culverting and filling of the existing ditch network along the route of the proposed roadway.
  • Ancillary road works, ducting, footpaths, ducting, boundary treatment, public lighting and all associated electrical works etc., relocation of existing services to new footpaths including Gas, Eircom, NTL, water, ESB, Esat.
  • Landscaping works.