Client: Department of Defence


Liffey Developments were acting as a main contractor and PSCS on this project.

The site is situated on a live Army Camp located in the Wicklow mountains.  The works involved the remediation of an area buried with military waste and its restoration.

Works included:

  • Site security – Fencing
  • Topographic Surveys – Pre - Excavation / Pre - Restoration / Post Restoration
  • Site Investigation
  • Drainage / Water and Leachate Management Works
  • Bulk Excavation
  • Soil testing and analysis
  • Hazardous Military Waste Excavation / Treatment and Removal From Site (120 tonnes)
  • Construction of waste segregation areas
  • Environmental Monitoring & Management (Water / Dust / Noise / Odours)
  • Site Restoration
  • Boundary treatment