Client: Gannon Homes

Value: €3,400,000


Liffey Developments were acting as a main contractor and PSCS on this project.

The site was located on a newly developed site which was surrounded by residential, commercial and agricultural lands.

Works included:

  • Site Investigation
  • Site Security – Fencing / Static Guard
  • Topographic Surveys – Pre - Excavation / Pre - Restoration / Post Restoration
  • Surface / Ground Water and Leachate Management Works
  • Bulk Excavation 6.0m deep (15,000m3 excavated)
  • Soil testing and analysis
  • Hazardous Waste Excavation / Treatment and Removal From Site (25,000 tonnes removed)
  • Construction of waste segregation areas
  • Environmental Monitoring & Management (Water / Dust / Noise / Odours)
  • Site Restoration (34,250 tonne imported fill material)